40x100 Metal Building Base Package

Use: , , , , , , ,
Need a price?
  • Compare local steel building companies
  • No fees
  • No obligation
  • Free buyers guide
  • Design and Build or Kits
  • Custom or packaged plans
“GBE secured me prices 30% lower than I was finding myself. 5 star!” COMPARE PRICES ▷

Building Overview

40×100 base building packages are big enough to fit a Boeing 737-100 comfortably and come with the many benefits of using prefabricated kits.

For example, prefabricated packages can sometimes be built in as little time as a few months, or even a few weeks, depending on the size of the building.

This is because each of the building parts is manufactured elsewhere then brought to your location for assembly.

Steel also has some benefits, such as steel is an affordable option, it is reliable and resistant to many of the problems associated with wood such as rot and insect infestation.

Popular sizes:

How to save money on your steel building ?

Locking in a price when steel prices are low, along with a break in the production calendar can be a great way to save. Fill the form to talk with expert!

Categories: , .
×